Data Centre Facilities

ACS Syan's primary data centre is located at Hortonwood in Telford, Shropshire. Our second data centre is located in Newport, Shropshire and provides Disaster Recovery and Business Continuity facilities in addition to a secure data centre.

Facility Hortonwood Newport
  Primary Data Centre Secondary Data Centre
Configuration 2 x halls each 375m² with capacity for a 3rd hall 1 x hall of 500m² plus 125 seat Business Continuity facility
Security

Complete site protected by perimeter fencing with remote controlled access gates.

Full perimeter lighting and extensive system of CCTV surveillance cameras providing full external coverage.

24 x 7 on-site physical security.

Controlled access control system serving all external and key internal doors.

Intruder detection system (including roof space).

Data centre and operations bridge served by additional CCTV and access control measures.

Complete site protected by perimeter fencing with remote controlled access gates.

Full perimeter lighting and extensive system of CCTV surveillance cameras providing full external coverage.

24 x 7 physical security monitoring site CCTV surveillance and alarm systems.

Controlled access control system serving all external and key internal doors.Intruder detection system remotely monitored 24 x 7.

Fire Detection

Fire detection (heat and smoke) with multiple FM200 Gas suppression systems covering all computer and communications rooms.

Independent system covering the on-site tape storage room.

Fire detection (heat and smoke) with a FM200 Gas suppression system covering the computer and communications rooms.

Independent system providing coverage of plant room areas.

Power Supply Dedicated 1000kVA secure, on-site transformer with direct connection to local ring main. 5 Power Distribution Units feeding protected single and 3-phase sockets flood wired throughout the computer halls. Dedicated 500kVA secure on-site transformer with direct connection to local ring main. 4 Power Distribution Units feeding protected single and 3-phase sockets flood wired throughout the computer hall.
UPS Multiple 160kVA UPS systems (n+1 configuration) capable of supporting all systems for a minimum of 20 minutes. Multiple 160kVA UPS systems (n+1 configuration) capable of supporting all systems for a minimum of 30 minutes.
Standby Generator 800kVA generator with an on-load startup time of 30 seconds capable of running for a minimum of 72 hours without refuelling. 350kVA generator with an on-load startup time of 30 seconds capable of running for a minimum of 72 hours without refuelling.

Air Conditioning

Use of Refrigerants

Multiple independent air conditioning units (n+1 configuration) each providing 73kW of cooling capacity.

All air conditioning units meet EU legislation for the utilisation of Non ODP (Ozone Depleting Potential) substances in accordance with EU2037/2000. A replacement programme is in place to withdraw HCFC models prior to 2010.

Multiple independent air conditioning units (n+1 configuration) each providing 80kW of cooling capacity.

All air conditioning units fully meet EU legislation for the utilisation of Non ODP (Ozone Depleting Potential) substances in accordance with EU2037/2000, and comply with the requirements of the legislation post 2010.

Data Network Services and Telecomms Services Both sites are served by two telecommunication exchanges providing substantial capacity and service redundancy. In addition, there is a dedicated dark fibre link between the Hortonwood and Newport sites backed by a 100Mb LES link offering significant resilience.
Environment ACS Syan regularly reviews energy usage and introduces environmental policies and energy saving initiatives in accordance with ACS Syan Environmental Policy.

 